GreenNet Optisim Case Studies
GreenNet optisim can be used and applied across a range of industries and problems. See case studeies below
Rollingstock Fleet Expansion Study
The Problem The Client operates a heavily constrained and complex rail logistics operation that moves grains of various types from over 50 inland locations and 3 main ports (see Appendix A). The Client wanted to know how much additional rollingstock (locomotives and...
Capital Planning for Rail Maintenance Workshop Expansion
The Problem The Client (Tier 1 Iron Ore Miner) needed to assess whether the introduction of a significant amount of new rolling stock assets (both locomotives and wagons) would be able to be maintained with their current maintenance workshop infrastructure and layout....
Why use GreenNet Optisim?
Agile
Start simulating within days with cloud-based software.
Comprehensive & Powerful
All of the tools. All of the power.
Future-proofing
Data now for future changes.

Learn more about GreenNet Optisim